Mirakon AG

  • Full Screen
  • Wide Screen
  • Narrow Screen
  • increase font size
  • Default font size
  • decrease font size
English (United Kingdom)Deutsch (DE-CH-AT)Português (pt-PT)French (Fr)

milestones

1984

Establishment of the company MIRAKON by Pedro Ferreirinha and Dr. V. Hubka. 

A goal of the company was the support for designing technical systems.
Therefore the name MIRAKON is derived from: Means for Efficient Construction (Mittel für Rationelle Konstruktion).

Our first product, the HKB (manufacturing costs computation) (Hrstellkosten-Berechnung), made possible to the technical designers,due to a technical machine system description, to generate the manufacturing process and to compute times and costs.

Our first customer: Maag-Zahnräder

 

1985

Beginning of intensive co-operation with BMW Munich, within the area of manufacturing costs of devices

 

1986

ETH Zurich: Integration of HKB in the teaching of mechanical engineering

 

1988

BMW: development of HKB to be used as configuration system for whole tools and production plants

 

1989

ABB Turbo-Systems: Beginning of an intensive co-operation

 

1990

Burgmann GmbH, Wolfratshausen (D) : Work plan preparation with HKB

 

1992

Development of IOS (Integrated Organization System). Thus one can organize and plan business processes. Examples: Scheduling, stock management, sales planning, etc.

 

1994

Hader SA, La Chaux de Fonds: Calculation of offers with HKB, first implementation of IOS

 

1995

Firma Grau, Schwäbischgmünd (D): Expert system for the configuration and calculation of molds

 

1998

Developed the Mirakon-System,a software component system for knowledge-based construction and planning of products and business processes. Thus, specific applications, can be developed in short time, e.g. product configuration systems, cost calculation, date and capacity planning, layout planning, FMEA systems, etc.

 

1999

Development of a FMEA-process application with ABB-TS

 

2000

Start of project Kompass (supported by the government KTI-project) with ABB-TS and ETH Zurich: Knowledge management

 

2001

Project WIVA: knowledge based variant construction (Wissensbasierte Variantenkonstruktion) with Burgmann GmbH (D)

 

2002

Project ABCD: supported by the government KTI-project, in co-operation with ETA (SWATCH-daughter), Mecanex and ETH Lausanne

 

2003

Hader SA develops its ERP system with the Mirakon system

 

2004

Project EDS in BMW: a knowledge management system for the purchase department

 

 

You are here: