Mirakon AG

  • Full Screen
  • Wide Screen
  • Narrow Screen
  • increase font size
  • Default font size
  • decrease font size
English (United Kingdom)Deutsch (DE-CH-AT)Português (pt-PT)French (Fr)

references

BMW AG

Munich / Germany
since 1985

Project engineering of particular operational devices
Cost calculation within the areas: Tools, engine construction, painting, production technology, engines, chassis.

 

ABB TS

Baden / CH
since 1991

Calculations of parts and constructive groups
Comparison of calculations
FMEA-Process
Knowledge management

 

BURGMANN GmbH

Eurasburg / Germany 
since 1990

Administration of schedules
Pre-calculated times
Capacity planning with bottleneck analysis
Knowledge based variant construction

 

HADER SA

La Chaux de Fonds / CH 
since 1995

Product administration and placement of offers
Stock management
Work planning and quality control
Production planning and control

 

ETH Zürich

since 1985

Calculation of manufacturing costs of machine parts 
Basis for the semester work: Knowledge modules for new production technology

 

 

 

You are here: